During these times of recession every government budget is crucial for a country to get out of the crisis. As the the new president of the United States of America holds the increase in salary and bonuses of government officials for the sake of recession, a multimillion study for a plant for horse processing is just a complete waste. To just what this is read the rest here:
Thinking about making a comment on this blog post? Great! But please remember that this space is for just that, comments about this blog post. It is not a place to post random thoughts about other stuff. We found that most of the "comments" posted here are not comments at all and should have really been posted in our forum. So:
If you are just planning to spam... go away as all the comments are premoderated
Have something to actually say about this blog post, please submit your comment here:
Leave a comment:
We welcome your comments on this post in the Equine and Horse Blog. That means a comment on this post, not something about some other topic.
Name: (required)
Email: (required, not published)
Comment:
Note: Your comment will be immediately submitted and you will have no opportunity to review to edit it.
It is recommend that you register on Equine and Horse Blog and login so you can include full html (ie: links). We don't have a chapta because we think we're smarter than the spambots.
20090206-233121-Slaughter-Study-A-Complete-Waste
* com * top 100 * 10 * 5093 * Blog * Espanol *
Have you added a link to us from your website? (5093):
<a href="http://blog.horseandequineworld.com">Equine and Horse Blog</a>
news Slaughter Study: A Complete Waste; Equine and Horse Blog